Skip navigation
navigation section title graphic for Auditor
navigation section title graphic for programs
 
navigation section title graphic for resources
navigation section title graphic for services
navigation section title graphic for newsletter
Subscribe

View Region newsletter

Comprehensive Regional Airport Access

Airport Documents

SANDAG has led the effort to evaluate concepts for improved transit and roadway connectivity to San Diego International Airport. The Airport Connectivity Analysis and accompanying appendices are presented below. On September 27, 2019, the SANDAG Board of Directors allocated funding to begin preliminary engineering and environmental studies to further advance the airport connectivity concepts. Past studies are also presented below for historical reference.

Present Studies

Airport Connectivity Analysis

North Harbor Drive Mobility and Access Study - Excerpt

APM Alignment Concept - Lea and Elliot

North Harbor Drive Transit Lanes

Airport Priority Roadway - Phase 1

Airport Priority Roadway - Phase 2

Layout and Traffic Flow Concepts at NAVWAR

Layout and Traffic Flow Concepts at ITC

Evaluation of Near-Term Connectivity Concepts

APM Concepts 1, 2, and 3

Trolley Concepts 4a and 4b

Hortensia Interchange and DAR at NAVWAR

Washington - Pacific Highway Intersection and DAR at ITC

Laurel Street Ramps to I-5 and Laurel Street Widening

Airport Priority Roadway at Harbor Drive

Basis of Cost Estimate

Cost Estimate

Central Mobility Hub at NAVWAR - Architectural Images

Central Mobility Hub at ITC - Architectural Images

Past Studies

1982 Point Loma-Airport Trolley Extension Study (Final Report)

1982 Point Loma Trolley Extension Technical Memorandum

2003 Airport Transit Access and ITC Site Evaluation Study

2003 Central Interstate 5 Corridor Study

2008 Airport Master Plan - Final Environmental Impact Report

2008 Destination Lindbergh - Aviation Activity Forecast

2010 ITC Study Phase 1 - Final Report

2012 Airport Multimodal Accessibility Plan

2012 Destination Lindbergh - TC Staff Report 9-21-12

2014 City of San Diego Traffic Signal Communications Master Plan

2014 Mid-Coast Corridor Transportation Impacts and Mitigation Report

2014 SDCRAA Airport Development Plan Site Plan

2016 City of San Diego Downtown Mobility Plan

2016 San Diego International Airport Transit Plan

2016 Uptown Community Plan

2017 Midway-Pacific Highway and Old Town Communities Mobility Report

2017 Port Master Plan

2018 Downtown-Airport Skyway Feasibility Study - Final

2018 SD Airport Terminal 1 Draft EIR Section 314 Traffic and Circulation

2018 North Harbor Drive Mobility and Access Study Final

Supporting Studies

1987 Peninsula Community Plan

2001 Naval Training Center Precise Plan

2006 City of San Diego Downtown Community Plan

2008 City of San Diego General Plan Mobility Element

2008 Lindbergh Intermodal Transportation Center - SANDAG SDCRAA Workshop 2-8-08

2013 City of San Diego Bicycle Master Plan

2014 Mid-Coast Corridor Transportation Impacts and Mitigation Report

2014 SDCRAA Airport Development Plan Site Plan

2015 City of San Diego Pedestrian Master Plan Volume 1

2017 KHA Harbor Drive Mobility Study - Appendix J

2018 TC Staff Report - Short-Term Options for Trolley Connections

San Diego Regional Bicycle Plan-Riding to 2050